S&P 500 5,235.18 +1.02%EUR/USD 1.0840 +0.21%GBP/USD 1.2710 +0.14%USD/JPY 149.50 −0.18%BRENT $82.40 −0.81%BTC $67,800 −0.21%GOLD $2,341 +0.55%NASDAQ 16,420.55 +0.74%S&P 500 5,235.18 +1.02%EUR/USD 1.0840 +0.21%GBP/USD 1.2710 +0.14%USD/JPY 149.50 −0.18%BRENT $82.40 −0.81%BTC $67,800 −0.21%GOLD $2,341 +0.55%NASDAQ 16,420.55 +0.74%
A daily business newspaper · Founded in 2026

Money Talk

Finance and markets: business, quotes, gold, energy and releases.

Virginia Beach Breaks Ground on Windsor Woods Flood Defense Station

Construction has begun on the Windsor Woods Pump Station, a central pillar of Virginia Beach’s effort to shield residents from storm surges and heavy rainfall. The facility serves the Windsor Woods, Princess Anne Plaza, and The Lakes regions, acting as a critical node in the city's voter-approved flood resilience network.

Virginia Beach Breaks Ground on Windsor Woods Flood Defense Station
Photo: Bio & News

Arcadis is partnering with a design-build team led by Flatiron-Dragados to deliver this infrastructure. The project integrates physical barriers with advanced monitoring technology, including water level sensors and rain gauges that feed into a unified stormwater control center. By linking these assets, the city aims to synchronize its hydraulic models with real-time weather forecasts to manage tidal and rainfall flooding more effectively.

LJ Hansen, the city’s Director of Public Works, noted that the collaborative design process serves as a potential blueprint for other climate-vulnerable communities. Travis Davis, Arcadis’ Mid-Atlantic Resilience Water Market Leader, emphasized that the station is designed to function as part of a larger, connected system, complementing existing tide gates to protect homes and essential community access routes.

Share article
TelegramXFacebook

When reusing this material a link to Money Talk is required.

Comments (0)

Leave a comment

No comments yet. Be the first!