The Poteet site currently sustains a throughput of over 1 million tons of high-quality 100 mesh frac sand annually. By absorbing the JW Sands infrastructure, JARCO Companies moves beyond its traditional wet sand model to offer a complete, dried product line. CEO Joe Regalado noted that the transition provides the necessary capacity to meet the accelerating demand for regional proppants.
This consolidation effectively streamlines the company’s supply chain, allowing for end-to-end processing—mining, washing, and drying—at a single location. The integration aims to shorten lead times for clients requiring specific mesh grades, solidifying JARCO’s footprint in the Texas energy service sector.





Comments (0)
No comments yet. Be the first!